Contract opportunities

Skerry of Ness and Hoxa Head Lighthouse Refurbishments

The Northern Lighthouse Board (NLB) have published a contract notice seeking a contractor for works in Orkney. The works will include Wash down and remove lichen/marine growth from surfaces of all structures (GRP, Concrete and Metal work). Repairs to GRP daymark panels and metalworks as required. Existing fence to be re-strung. No electrical works shall be involved, and the optic shall remain operational throughout. 

Northern Lighthouse Board

Skerry of Ness:

Skerry of Ness is located south of the town of Stromness on the mainland of Orkney. The site is located on the longitude and latitude of 58°56.960 N 003°17.830 W. Together with Hoy Loy Lighthouse the station denotes the entry to the port of Stromness. The station is located in tidal waters 200m from the mainland. The shoreline can be access via Guardhouse Park Road leading from the town of Stromness. The station can be accessed at low tide by foot. At high tides, boat access is required.

Description of station:

10m high post-tensioned white concrete column, topped with concrete platform. The main concrete column is fixed to a square concrete foundation fixed to the seabed. The platform is accessed via a ladder. There are fenders to each side of the ladder to allow a boat to access the ladder at high tides. The platform is guarded by a handrail and safety gate to the top of the ladder. The optic cubicle is located on the edge of the platform, with solar panels fixed to the seaward facing side of the cubicle. The optic is powered by batteries stored within the cubicle, which are trickle charged by the solar panels. There are no welfare facilities at this station.

Description of works:

The works are of a purely civil nature. The concrete structure is to be power washed to remove lichen/marine growth from surfaces. Any concrete repairs will be carried out as necessary following power washing. Any corroded metalwork or fixings shall be replaced, this may involve replacement of ladders, handrails, and fenders. The structure shall be redecorated. No electrical works shall be involved, and the optic shall remain operational throughout.

Minimum Certification Requirements

Contractor will need rope access certificates (IRATA Certification)

Important Note to Bidders: There is a mandatory site visit in Orkney on 10 September - further details will be given via the message facility. Those parties who have expressed interest in a future Orkney refurbishment at Hoy Sound (High) can visit this site on 11 September. To avoid the need for two trips. There will be a separate site visit planned for those parties who have only expressed an interest in Hoy Sound in due course. Those attending site visits will need to bring suitable PPE and clothing, further details to follow via the messaging facility.]

Please note all details and dates included are subject to change.

Please note that NLB do not use Public Contracts Scotland to publish details of their opportunities and to read more details, please click here:

Submission

Enquiry deadline 16 September 2026, 5:00pm

Tender submission deadline 28 September 2026, 2:00pm

Submission address and any special instructions

https://www.delta-esourcing.com/

 

Share this page

SDP Scotland logo Loading